Fast
Internet

Offer – 3-times thought-out

Our colocation offering consists of three components.

Using this approach, we can settle the resources consumed closely to the cause.

Rack Interconnects (passive pre-cabling) Rack Units
1/1 Rack Incl. 6 Cat. 6 copper connections 46/47
1/2 Rack Incl. 3 Cat. 6 copper connections 20/21
1/4 Rack Incl. 2 Cat. 6 copper connections 11
Power

For the power supply and air conditioning a base load per kW will be charged, which must cover the peak current.

The cost per kW base load depend on the efficiency of the colocation. We would be pleased to make a quote for the desired location.

Energy

The charging of the refined energy supply (diesel-assisted, UPS protected) is done on a lump-sum basis or on a costs-by-cause principle depending on the package ordered.

The prices vary depending on the current supplier (always 100% renewable / hydropower). We would be pleased to make a quote for the desired location.

Interconnects

More copper- or fibreconnections on request.